Inspection Expediting Quality | Power Plant Awaza | Lotus Energy

6 Mar by

Inspection Expediting Quality | Power Plant Awaza | Lotus Energy

Client : Turkmenenergo Power Corporation of the Ministry of Energy and Industry of Turkmenistan
Scope : Lump sum turnkey project for the const. of a simple cycle 254 MW power plant

* 2 x GE Frame 9E • GT Generators • 220 kV Switchyard • 110 kV Switchyard
* Transformers • Main equipment for substation complex 220kV, 110/35/10kV
* Transmission Lines for 110kV and 220kV and cable lines of 35kV for the power distribution lines of Awaza Tourism Zone of the Turkmenbashi city

Turbine license, engineering and supply by General Electric

By